INDUSTRIAL
RIVERRIDGE RECYLING, PORTADOWN
Upgrade of site-wide electrical infrastructure to include a new 3MVA high voltage (11kV) incoming NIE electric supply.
The works were undertaken in a live waste recycling plant requiring significant coordination and collaboration with the site management and staff to minimise disruption.
- HV Switchgear within GRP Housing
- HV Cable Installation
- 4MVA Transformer Installation
- 6,300A Rated LV Switchboard
- Cable Containment
- LV Mains Distribution
- Small Power
- General Lighting
- Emergency Lighting
- Data Cabling
- Air Conditioning
- Power Factor Correction
- Harmonic Filtration
- Electrical Testing & Commissioning