INDUSTRIAL

RIVERRIDGE RECYLING, PORTADOWN

Upgrade of site-wide electrical infrastructure to include a new 3MVA high voltage (11kV) incoming NIE electric supply.

The works were undertaken in a live waste recycling plant requiring significant coordination and collaboration with the site management and staff to minimise disruption.

  • HV Switchgear within GRP Housing
  • HV Cable Installation
  • 4MVA Transformer Installation
  • 6,300A Rated LV Switchboard
  • Cable Containment
  • LV Mains Distribution
  • Small Power
  • General Lighting
  • Emergency Lighting
  • Data Cabling
  • Air Conditioning
  • Power Factor Correction
  • Harmonic Filtration
  • Electrical Testing & Commissioning